Back to Services
New Service

HDD Drilling (Horizontal Directional Drilling)

We use a dedicated HDD drilling machine to drill horizontally and create a trenchless path for underground cable laying — without disturbing the top surface layer. This replaces traditional trench digging and reduces surface damage.

Trenchless Method

Minimal surface disturbance for roads, pavements, and active zones.

Faster Execution

Reduced restoration work compared to open trench excavation.

UG Cable Ready

Horizontal path + cable laying support, alignment and finishing.

What we deliver

  • Horizontal directional drilling as per site requirement
  • Trenchless route creation for UG cable laying
  • Support for cable pull-through and placement
  • Safe execution near roads/structures (as feasible)
  • Work completion with minimal surface disturbance
HDD Drilling Machine - Placeholder
Replace this placeholder with HDD machine / work-site photo

How HDD drilling works

A clear step-by-step process to ensure safe and accurate cable corridor creation.

01

Site Assessment

Understand route, surface constraints, entry/exit points, and execution feasibility.

02

Drilling Setup

Machine setup and alignment for the required horizontal path.

03

Directional Drilling

Drill horizontally to create the path with minimal disturbance on top layer.

04

UG Cable Laying

Lay underground cable through the drilled path and finish cleanly.

Work Photos (Placeholders)

Add HDD machine, drilling operation, entry/exit pit, and cable laying photos.

Placeholder 1
Placeholder 2
Placeholder 3
Placeholder 4

Need HDD drilling for UG cable works?

Send route details and location — we’ll respond with plan and estimate.

Contact Us